Friday 9 March 2018 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Mar 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes an observation of SN 2018gk which was accepted as a Target of Opportunity on Feb 13. |
------------------------------------------
Radiation Belts E0102-72 ACIS-S E0102-72 ACIS-I NGC3585 ACIS-S Mar 13 SN1987A ACIS-S/HETG NGC3585 ACIS-S Mar 14 SDSSJ131121.32+2227 ACIS-S SN2018gk ACIS-S Radiation Belts Mar 15 SN1987A ACIS-S/HETG NGC3585 ACIS-S Mrk59 ACIS-S PSRJ1605-5257 ACIS-S Mar 16 PSRJ2032+4127 ACIS-S Mrk59 ACIS-S Radiation Belts Mar 17 DDO68 ACIS-S NGC3393 ACIS-S Mar 18 SN1987A ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.