News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 15 February 2019 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A Chandra press release was issued on Feb 14 describing Chandra observations that address the long-standing missing matter problem. The analysis suggests that the missing matter is in the form of a filamentary Warm-Hot Intergalactic Medium (WHIM). The team was able to stack 17 Chandra X-ray spectra to reveal the extremely weak absorption signature which signals the presence of the WHIM. For details see: http://chandra.harvard.edu/press/19_releases/press_021419.html

The schedule of targets for the next week is shown below and includes an observation of Sco X-1 coordinated with Global VLBI.



------------------------------------------
        M84                    ACIS-S       Feb 18
        PSRJ1023p0038_s2       ACIS-S
        ESO005-G004            ACIS-S
        SDSSJ103712.55+01544   ACIS-S
        Radiation Belts                     Feb 19
        HCG57                  ACIS-S
        CGMW5-04382            ACIS-S
        Abell98                ACIS-I
        3CR239.0               ACIS-S       Feb 20
        M84                    ACIS-S
        2XMMJ185348.4-01022    ACIS-S
        1E1841m045_s2          ACIS-S
        SDSSJ1152+3313         ACIS-I       Feb 21
        Mrk417_s2              ACIS-S
        Radiation Belts                     Feb 22
        ScoX-1                 ACIS-S/HETG
        HCG57                  ACIS-S
        ScoX-1                 ACIS-S/HETG
        HCG57                  ACIS-S
        ScoX-1                 ACIS-S/HETG
        Radiation Belts                     Feb 24
        ScoX-1                 ACIS-S/HETG
        HCG57                  ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports