CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 2 August 2019 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Aug 1 to swap the prime solid-state recorder (SSR) from the A-side to the B-side. This swap concludes a six-month interval of health and trending data collection on SSR-A. The schedule of targets for the next week is shown below and includes an observation of SN2003gk, which was accepted as a Director's Discretionary Time Target of Opportunity on Jun 17. |
------------------------------------------
Radiation Belts Aug 4 Abell2146 ACIS-I SN2003gk ACIS-S Aug 5 SPT-CLJ2031-4037 ACIS-S NGC3393 ACIS-S Aug 6 Radiation Belts Aug 7 CHIPS2155-3727 ACIS-I IRAS18293-3413 ACIS-S Aug 8 NGC5548 ACIS-S/HETG Radiation Belts Aug 9 SS433-W50easterne ACIS-I NGC5548 ACIS-S/HETG NGC4500 ACIS-S Aug 11
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports