CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 23 August 2019 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Aug 16-18 to dump OBC-A and -B memory as a follow-up to the OBC patch on Aug 16. The dump will be used to update the baseline memory images maintained on the ground. An additional real-time procedure was executed on Aug 17 to perform full-frame dark current readouts of the Aspect Camera Assembly CCD. The schedule of targets for the next week is shown below and includes an observation of EXO 1846-031 coordinated with VLA and NuSTAR, and an observation of Eta Carinae coordinated with HST. |
------------------------------------------
Radiation Belts Aug 25 EtaCarinae ACIS-S/HETG MRC2338-290 ACIS-S Aug 27 Abell2345 ACIS-I GW170817 ACIS-S EXO1846-031 ACIS-S/HETG Aug 28 Radiation Belts N132D ACIS-S Aug 29 GW170817 ACIS-S Abell2345 ACIS-I GW170817 ACIS-S Aug 30 Abell2146 ACIS-I Radiation Belts Aug 31 Abell2345 ACIS-I 4FGLJ2029.5-4237 ACIS-S Sep 1 N132D ACIS-S YZCet ACIS-S TDE2 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports