CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 17 January 2020 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Jan 15 to command ACIS to dump the flight software from EEPROM. The dump was compared to images maintained on the ground as a routine check. Another real-time procedure was executed on Jan 17 to patch the CPE flight software in order to correct the gyro status data. The schedule of targets for the next week is shown below and includes an observation of Eta Carinae coordinated with HST, and an observation of 4FGL J0336.0+7502 which was accepted as a Director's Discretionary Time Target of Opportunity on Dec 18. |
------------------------------------------
PROCYON HRC-I Jan 19 SPT-CLJ2336-5252 ACIS-I MKN421 ACIS-S/LETG Jan 20 J144556.9+165308.7 ACIS-S Radiation Belts Jan 21 F2M1324+0537 ACIS-S MKN421 ACIS-S/LETG MKN421 ACIS-S/LETG SPT-CLJ2336-5252 ACIS-I MKN421 ACIS-S/LETG Jan 22 PGC044558 ACIS-S HD82443 ACIS-S J123538.7+041244.8 ACIS-S Jan 23 Radiation Belts MKN421 ACIS-S/LETG MCG+08-33-046 ACIS-S Jan 24 MKN421 ACIS-S/LETG SPT-CLJ2320-5233 ACIS-I 4FGLJ0336.0+7502 ACIS-S Jan 25 PSS0926+3055 ACIS-S SDSSJ0950+0246 ACIS-S 131242.4+555554 ACIS-S Radiation Belts Jan 26 EtaCarinae ACIS-S/HETG J095817.5+183858.1 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports