CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 3 April 2020 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Apr 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Of note this week were the Chandra Quarterly Review conducted on Apr 1 by teleconference and the Chandra Cycle 22 proposal deadline on Apr 2 at 6pm EDT. The schedule of targets for the next week is shown below and includes an observation of PKS0620-52, which was accepted as Target of Opportunity on Feb 5. |
------------------------------------------
CIZAJ0107.7+5408 ACIS-I Apr 6 Radiation Belts PKS0620-52 ACIS-I CIZAJ0107.7+5408 ACIS-I Apr 7 JWST-DTDF-9 ACIS-I HD114174 HRC-I JWST-DTDF-9 ACIS-I Apr 8 SPT-CLJ1315-2806 ACIS-I SDSSJ1346+5858 ACIS-S Radiation Belts Apr 9 NGC4472ULXs ACIS-S H1821+643 ACIS-S Spiderweb ACIS-S Apr 10 H1821+643 ACIS-S SPT-CLJ1315-2806 ACIS-I Apr 11 SNR0509-67.5 ACIS-S Radiation Belts Apr 12 SPT-CLJ1315-2806 ACIS-I KIC11606854 ACIS-S Spiderweb ACIS-S Apr 13
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports