CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 3 July 2020 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jul 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load. The schedule of targets for the next week is shown below and includes an observation of 3C273 coordinated with NuSTAR and XMM, an observation of Mrk 335 coordinated with NuSTAR and NICER, and observations of SN2020nlb, which was accepted as a Director's Discretionary Time Target of Opportunity on Jun 29. |
------------------------------------------
Radiation Belt Jul 5 MKN421 ACIS-S/HETG MKN421 ACIS-S/LETG MKN421 HRC-S /LETG MKN421 ACIS-S/LETG Jul 6 MKN421 HRC-S /LETG MKN421 ACIS-S/LETG MKN421 HRC-S /LETG MKN421 ACIS-S/HETG 3C273 ACIS-S/HETG OAO1657-415 ACIS-S/HETG gx5-1 ACIS-S/HETG Jul 7 MKN421 ACIS-S/HETG MKN421 ACIS-S/LETG MKN421 HRC-S /LETG MKN421 ACIS-S/LETG MKN421 HRC-S /LETG MKN421 ACIS-S/LETG MKN421 HRC-S /LETG MKN421 ACIS-S/HETG Radiation Belt Jul 8 Mrk335 ACIS-S/HETG BlankSky HRC-S Jul 9 Radiation Belt G1.9+0.3 ACIS-S SN2020nlb ACIS-S Radiation Belt Jul 10 N132D ACIS-S BlankSky HRC-S gx5-1 ACIS-S/HETG SN2020nlb ACIS-S Jul 12 N132D ACIS-S RXJ1856.5-3754 ACIS-S/LETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports