CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 14 August 2020 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load. The schedule of targets for the next week is shown below and includes an observation of Swift J1858.6-0814, which is a follow-up to a Target of Opportunity accepted on May 4. |
------------------------------------------
Radiation Belts Aug 16 PSRJ0821-4300 ACIS-S SPT-CLJ2215-3537 ACIS-I PSRB1259-63 ACIS-I Aug 18 SPT-CLJ2215-3537 ACIS-I IC2395 ACIS-I Aug 19 Radiation Belts IC2395 ACIS-I SPT-CLJ2215-3537 ACIS-I Aug 20 TXS2116-077 ACIS-S RXCJ1313.1+4616 ACIS-I Sgr A* ACIS-I TXS2116-077 ACIS-S Aug 21 J1315+516 ACIS-I GJ358 ACIS-S Radiation Belts Aug 22 H1821+643 ACIS-S TXS2116-077 ACIS-S SwiftJ1858.6-0814 ACIS-S Aug 23 SDSSJ1407+2418 ACIS-S TXS2116-077 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports