Friday 6 November 2020 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Oct 30 and Oct 31 to dump OBC-A and -B memory as a follow-up to the flight software patches executed on Oct 29. The dump will be used to update the baseline memory image maintained on the ground. Real-time procedures were also executed on Nov 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Additional real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load. The schedule of targets for the next week is shown below and include observations of SN2020tcw, which was accepted as a Target of Opportunity on Oct 16, and an observation of AT2020xnd, which was accepted as a Target of Opportunity on Oct 26 and is coordinated with NuSTAR. |
------------------------------------------
Radiation Belts Nov 9 NGC1167 ACIS-S Capella HRC-S /LETG SN2020tcw ACIS-S Nov 10 AT2020xnd ACIS-S ESO543-8 ACIS-S SNR0509-67.5 ACIS-S UGC2638 ACIS-S Nov 11 NGC1167 ACIS-S SN2020tcw ACIS-S Radiation Belts Nov 12 SNR0509-67.5 ACIS-S WISEAJ053532.12+4011 ACIS-S NGC1167 ACIS-S MCG-02-08-014 ACIS-S Nov 13 SNR0509-67.5 ACIS-S NGC1253A ACIS-I NGC1167 ACIS-S SDSSJ103315.71+52521 ACIS-S Nov 14 SNR0509-67.5 ACIS-S Radiation Belts GLIMPSE-C01 ACIS-I Nov 15 SNR0509-67.5 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports