During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jun 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). An additional real-time procedure was executed on Jun 5 to determine new values for the HRC-I high-voltage ramp-up steps. The new voltage compensates for an expected decrease in HRC-I gain over the course of the mission. Of note this week was the release on Jun 6 of the CalDB version 4.11.2. The CalDB update includes an HRC-I MEAN QE file set upgrade to version N0015. https://cxc.cfa.harvard.edu/caldb/downloads/Release_notes/CALDB_v4.11.2.html Also of note this week was the second announcement of the symposium "25 Years of Science with Chandra", to be held in Boston December 3-6, 2024. https://cxc.cfa.harvard.edu/cdo/symposium_2024 The schedule of targets for the next week is shown below and includes an observation of SDSS J163810.07+1151 coordinated with HET, an observation of SS 433 coordinated with Swift and an observation of EP240414a which was accepted as a Director's Discretionary Time Target of Opportunity on May 16. |
------------------------------------------
GAL034.8-00.6IRDC ACIS-I Jun 9 SDSSJ163810.07+1151 ACIS-S Jun 10 Radiation Belts PS-ELQSJ092642.05-1 ACIS-S NGC6242 ACIS-I eRASSUJ112636.4-10 HRC-I Jun 11 SPT-CLJ2249-5528 ACIS-I HZ43 HRC-S /LETG NGC6242 ACIS-I PS-ELQSJ092642.05-1 ACIS-S Jun 12 WHLJ223301.3+131503 ACIS-I V750Ara ACIS-S/HETG Radiation Belts Jun 13 WHLJ223301.3+131503 ACIS-I PSR_B1821m24_s10 ACIS-S DESJ0322-18 ACIS-S CMZMolecularCloud ACIS-I Jun 14 DESJ0322-18 ACIS-S CMZMolecularCloud ACIS-I DESJ0322-18 ACIS-S XMMJ0.173-0.413 ACIS-I Jun 15 SS433 HRC-I A1795 ACIS-I Radiation Belts V750Ara ACIS-S/HETG EP240414a ACIS-S Jun 16 eRASSUJ175532.5-503 ACIS-S SDSSJ230013.20-0956 ACIS-S NGC5477 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports