Friday 24 January 2025 9.00am EST
Operations CXO Status Report, 24 Jan 2025, 9.00am EST During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Jan 24 to re-enable all MUPS thrusters in Normal Sun Mode. Previously only the cool-side thrusters (3 and 4) had been initially enabled. The update enables the hot-side thrusters (1 and 2) after a 2 hour cool down period at 160 degrees solar pitch angle and reduces the risk of an ineffective momentum auto-unload. Chandra passed through the second, third, and fourth eclipses of the season on Jan 18, 21, and 23, respectively, with nominal power and thermal performance. The schedule of targets for the next week is shown below, and includes an observation of EP250108a, which was accepted as a Director's Discretionary Time Target of Opportunity on Jan 17. |
------------------------------------------
Radiation Belts Jan 26 UGC9511 ACIS-S ZwCl0857.9+2107 ACIS-S Jan 27 2MASXJ17353371+2047 ACIS-S ZwCl0857.9+2107 ACIS-S PSZ2G060.13+11.44 ACIS-I ZwCl0857.9+2107 ACIS-S PSZ2G060.13+11.44 ACIS-I Jan 28 Abell370 ACIS-I ZwCl0857.9+2107 ACIS-S PSZ2G060.13+11.44 ACIS-I DQTauperiastron1 ACIS-I EP250108a ACIS-S Radiation Belts Jan 29 NGC244 ACIS-S DQTauperiastron1 ACIS-I PSZ2G192.18+56.12 ACIS-I A1795 ACIS-S DQTauperiastron1 ACIS-I Abell370 ACIS-I DQTauperiastron1 ACIS-I Jan 30 ZwCl0857.9+2107 ACIS-S PSZ2G060.13+11.44 ACIS-I DQTauperiastron1 ACIS-I ZwCl0857.9+2107 ACIS-S Abell370 ACIS-I DQTauperiastron1 ACIS-I Jan 31 PSZ2G178.94+56.00 ACIS-I Abell370 ACIS-I DQTauperiastron1 ACIS-I SN2016bkv HRC-I DQTauperiastron1 ACIS-I Radiation Belts Feb 1 SextansA ACIS-S Abell370 ACIS-I SextansA ACIS-S 2RXSJ150456.5+18303 ACIS-S ZwCl0857.9+2107 ACIS-S Feb 2 UGC7242 ACIS-I NVSSJ151148-105023 ACIS-S SextansA ACIS-S
------------------------------------------
Use of the LETG is suspended pending a detailed review of the Jan 11 grating insertion anomaly. All other spacecraft subsystems continued to support nominal operations.
Return to Status Reports