CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 27 February 2004 9.99am EST
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was completed on Feb 21 to perform a manual unload of momentum. The unload was performed at an attitude that ensured a cool starting temperature and thruster performance was nominal throughout the unload. The schedule of targets for the next week is shown below and includes 1.5 orbits of the Chandra Deep Field South and two observations of the earth. |
------------------------------------------
Radiation Belts Feb 29 CDF-S #1 ACIS-I Radiation Belts Mar 3 CDF-S #1 ACIS-I eta Ind ACIS-I Mar 4 Earth HRC-I Mrk 1210 ACIS-S FSC 10214+4724 ACIS-S AFGL 2688 ACIS-S Radiation Belts Mar 5 A1413 ACIS-I IRAS05436-0007 ACIS-S Mar 6 Earth HRC-I 1251-713 ACIS-S IC 3639 ACIS-S Mar 7 M101 ACIS-S SDSS J125140.33+00 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports