CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 4 April 2008 8.30am EDT
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Apr 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second procedure was completed on Apr 2 to reinitialize the flight software Thruster Command Processing subfunction to clear a benign overflow condition. The schedule of targets for the next week is shown below. |
------------------------------------------
Abell 1201 ACIS-I Apr 7 3C133 ACIS-S Apr 8 MWC 480 ACIS-S 3C305 ACIS-S Radiation Belts 1RXS J141256.0+792 ACIS-S Cepheus A ACIS-I Apr 9 NGC 7089 ACIS-S Apr 10 S29 ACIS-S RXCJ1558.3-1410 ACIS-S Radiation Belts NGC 2915 ACIS-S Apr 11 NGC3923 ACIS-S RXCJ0638.7-5358 ACIS-I Apr 12 S33 ACIS-S Apr 13 HCG 59 ACIS-S Radiation Belts 3C 288 ACIS-S Apr 14
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports