CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Thursday 5 August 1999 7.00am EST
The following is an overview of the events that occurred over the last 24 hours.
Completed a successful 5 minute IPS #4 burn using Liquid Apogee Engines (LAE) #2 and #4. The new perigee is now 5,657 km, the apogee is 139,141 km and the orbital period is 61 hours 7.3 minutes. IPS #5 burn is scheduled for Saturday, August 7 at 1:43 AM and will be an approximately 8 minute burn also using LAE #2 & #4.
Measured optical cavity pressure of 8.57 E-06 Torr. Pressure has been reduced from 8.8 E-06 in the last 24 hours Performed ACIS internal calibrations. Performed Dark Current Calibrations on the Aspect Camera Assembly. Events scheduled for the next 24 hours |
Return to Status Reports