CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Monday 13 September 1999 7.00am EST
During the last 24 hours the on-board load (P13) continued operation and included a coordinated observation of Capella with the Hubble Space Telescope, EUVE, BeppoSAX and the Very Large Array (VLA).
The procedure to re-insert the Low Energy Grating was completed successfully and initial assessment is that a software timing correction is needed to ensure the Mechanism Control Electronics (MCE) is turned off after retraction. The MCE was turned off manually following a grating retraction after the Capella observation. Assessment and analysis of the ACIS front-side energy resolution degradation continued. The next test with ACIS is to perform a bakeout of the instrument and raise the focal plane to 25 degrees C. This procedure was started at 4.30AM 9/13 and is planned to take 24 hours. The load was stopped in preparation for the procedure and the remaining HRC calibration observations re-planned for a later mission schedule. The bakeout sequence is proceeding nominally. |
Return to Status Reports