News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 26 January 2001 9.00am EST

During the last week, Chandra completed the observing schedule as planned.

A real-time procedure was conducted on 25 Jan at 5.30am EST to retract the LETG. Telemetry indicated a nominal retraction.

Of note this week was the completion of plans for the upcoming 2001 Spring Earth eclipse season. The 11-eclipse season will occur between 11 Feb and 9 Mar and requires 4 software patches that have been approved for uplink.

The planned observations for the coming week are shown below and include calibration observations of the UV-bright star Vega with all four imaging detectors. These observations will provide data to monitor the UV transmission of the instrument filters.

------------------------------------------
NGC 2681                ACIS-S       Jan 29 
Crab Nebula             ACIS-S       Jan 30 
Radiation Belt                       Jan 31 
M31 (multiple)          HRC-I
Vega                    HRC-I
Vega                    HRC-S
Vega                    ACIS-I       Feb 1  
Vega                    ACIS-S
RCW 86                  ACIS-S
1H 0707-495             ACIS-S/HETG  Feb 2  
Radiation Belt
1H 0707-495             ACIS-S/HETG  Feb 3  
Hydra A                 ACIS-S/HETG  Feb 4  
Abell 1068              ACIS-S
NGC 4449                ACIS-S
MITG J0414+0534         ACIS-S

------------------------------------------

All spacecraft subsystems continued to operate nominally.

Return to Status Reports