CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 26 January 2001 9.00am EST
During the last week, Chandra completed the observing schedule as planned.
A real-time procedure was conducted on 25 Jan at 5.30am EST to retract the LETG. Telemetry indicated a nominal retraction. Of note this week was the completion of plans for the upcoming 2001 Spring Earth eclipse season. The 11-eclipse season will occur between 11 Feb and 9 Mar and requires 4 software patches that have been approved for uplink. The planned observations for the coming week are shown below and include calibration observations of the UV-bright star Vega with all four imaging detectors. These observations will provide data to monitor the UV transmission of the instrument filters. |
------------------------------------------
NGC 2681 ACIS-S Jan 29 Crab Nebula ACIS-S Jan 30 Radiation Belt Jan 31 M31 (multiple) HRC-I Vega HRC-I Vega HRC-S Vega ACIS-I Feb 1 Vega ACIS-S RCW 86 ACIS-S 1H 0707-495 ACIS-S/HETG Feb 2 Radiation Belt 1H 0707-495 ACIS-S/HETG Feb 3 Hydra A ACIS-S/HETG Feb 4 Abell 1068 ACIS-S NGC 4449 ACIS-S MITG J0414+0534 ACIS-S
------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to Status Reports