Friday 14 December 2001 8.30am EST
During the last week, Chandra completed the observing schedule as planned.
A routine real-time procedure was completed on Dec 11 to update the on-board the Ephemeris. Work is nearing completion on the 2-week mission schedule to cover the holiday period from Dec 24 to Jan 6, 2002. Of note last week was the release of the CIAO 2.2.1 analysis software together with CALDB 2.10, and the release of a new web form for data search and retrieval. For details, see http://cxc.harvard.edu. The schedule of observations for the coming week is shown below and includes highly time constrained observations of the targets PHL 1811 and GX 301-2. |
------------------------------------------
G093.3+6.9 ACIS-I Dec 16 Radiation Belts Dec 17 PHL 1811 ACIS-S ARP 222 ACIS-S 0453-68.5 ACIS-S Dec 18 HD 93497 ACIS-S/HETG Dec 18 NGC 2110 ACIS-S/HETG Dec 19 Radiation Belts NGC 2110 ACIS-S/HETG Dec 20 3C 120 ACIS-S/HETG Dec 21 NGC 2110 ACIS-S/HETG Radiation Belts Dec 22 GX 301-2 ACIS-S/HETG Dec 23
------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to Status Reports