News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 20 August 2004 9.00am EDT

During the last week the observing schedule was replanned to include two observations of GRB 040812 that was approved as a fast turn-around Target Of Opportunity (TOO) on Aug 13. Loads were replanned and uplinked on Aug 15 for observing on Aug 17 and 22. Observations of Kepler and 1E0657-56 (portion) were impacted by the TOO and will be rescheduled for a later load.

The schedule of targets for the next week is shown below and includes observations of the Targets of Opportunity SN 2004dj and QS Tel.

------------------------------------------
0142-100               ACIS-S       Aug 23
SN 2004dj              ACIS-S
1E0657-56              ACIS-I
Radiation Belts                     Aug 24
1E0657-56              ACIS-I
Abell 13               ACIS-S       Aug 25
SNR1987A               ACIS-S/LETG  Aug 26
Radiation Belts
SNR1987A               ACIS-S/LETG  Aug 27
CXOGC J174540.0-29     ACIS-I       Aug 28
Vega                   HRC-I
QS Tel                 HRC-S/LETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.