CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 27 June 2008 9.00am EDT
Operations CXO Status Report, Friday 27 Jun 2008, 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Chandra passed through the fourth, fifth, and sixth eclipses of the 2008 Summer season on June 20, 23 and 26 with nominal power and thermal performance. The schedule of targets for the next week is shown below and includes a TOO, A1744-361, coordinated with RXTE. |
------------------------------------------
PKS2155-304 ACIS-S/LETG Jun 30 AX J1700.1-4157 ACIS-I LEDA 183026 ACIS-I Jul 1 WR 2 ACIS-S IGR J12072+2535 ACIS-I 3CRR 65 ACIS-S IC 2574 ACIS-I cl0327+0233 ACIS-I Radiation Belts Jul 2 SNR 1987A ACIS-S/HETG PKS2155-304 ACIS-S/HETG Jul 3 PKS2155-304 ACIS-S/LETG PKS2155-304 HRC-S/LETG PKS2155-304 ACIS-S/LETG PKS2155-304 HRC-S/LETG PKS2155-304 ACIS-S/LETG PKS2155-304 HRC-S/LETG PKS2155-304 ACIS-S/HETG Jul 4 AEGIS-2 ACIS-I Radiation Belts SNR 1987A ACIS-S RXCJ0547.6-3152 ACIS-I S26 ACIS-S RXJ1131-1231 ACIS-S A1744-361 ACIS-S/HETG Jul 6 TWA-8 ACIS-S AEGIS-2 ACIS-I A1744-361 ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports