Friday 5 September 2008 8.00am EDT
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Sep 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Sep 8 Carina Clusters ACIS-I Cartwheel ACIS-S Sep 9 Carina East ACIS-I Radiation Belts Sep 11 AEGIS-2 ACIS-I IGRJ13186-6257 ACIS-I Sculptor Dwarf ACIS-S IGRJ11098-6457 ACIS-I Sep 12 AEGIS-2 ACIS-I Radiation Belts Sep 13 AEGIS-2 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.