News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 7 May 2010 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on May 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

Preparations are complete for the start of the summer 2010 eclipse season beginning on May 9. This season contains 17 eclipses (15 medium and 2 short) and will end on June 20.

The schedule of targets for the next week is shown below includes an observation of NGC 5408 X-1 coordinated with HST and an observation of Sgr A* coordinated with a ground-based observatory.

------------------------------------------
Radiation Belts                     May  9
A1750s                 ACIS-I
NGC5077                ACIS-S
SDSS0924+0219          ACIS-S       May 10
A1795                  ACIS-S
SWEEPS_FIELD           ACIS-I
A1795                  ACIS-I       May 11
A1750n                 ACIS-I
M87                    ACIS-S
SWEEPS_FIELD           ACIS-I
Radiation Belts
SWEEPS_FIELD           ACIS-I       May 12
SNR0049-73.6           ACIS-S
0FGLJ1413.1-6203       ACIS-I
SgrA*                  ACIS-I       May 13
SWEEPS_FIELD           ACIS-I       May 14
SDSSJ171300.39+2817    ACIS-S
M87                    ACIS-S
Radiation Belts
SNR0049-73.6           ACIS-S
Q0957+561              ACIS-S       May 15
SDSSJ162636.40+3502    ACIS-S
SWEEPS_FIELD           ACIS-I
NGC5408X-1             ACIS-S
ChandraDeepField-S     ACIS-I
PSRB1451-68            ACIS-S       May 16

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports