News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 21 May 2010 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the third, fourth, and fifth eclipses of the 2010 summer season on May 14, 17, and 19respectively, with nominal power and thermal performance.

A real-time procedure was executed on May 20 to patch the flight software. The patch was to a stored command sequence (SCS), which will autonomously monitor for momentum unloads. If one is detected, the SCS will terminate it after 400 seconds and then ensure that no subsequent unloads take place within the next hour, thereby allowing thruster valve temperatures to cool. This patch is to minimize the time that the MUPS thruster might be operating under thermal-choking conditions.

The schedule of targets for the next week is shown below and includes an observation of NGC 5408 X-1 coordinated with HST.

------------------------------------------
Radiation Belts                     May 25
SNR0049-73.6           ACIS-S
ESO362-G18             ACIS-S
Q0957+561              ACIS-S
NGC5576                ACIS-S       May 26
Abell1836              ACIS-I
NGC6618PG              ACIS-I       May 27
M31                    ACIS-I
Radiation Belts
SNR0049-73.6           ACIS-S       May 28
6dFJ0405204-364859     ACIS-S
NGC5408X-1             ACIS-S
ChandraDeepField-S     ACIS-I
Abell0578              ACIS-S       May 29
Radiation Belts                     May 30
SPT-CL0534-5005        ACIS-I
G308.3-1.4             ACIS-I       May 31

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports