CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 13 August 2010 9.00am EDT
During the last week the observing schedule was replanned to include a
60 ks observation of the source H 1743-322 that was accepted as a fast
turn-around Target Of Opportunity (TOO) on Aug 6. The loads were
replanned to remove observations of PSRB0906-49, SDSSJ130802.04+5538,
SDSSJ135920.99+5137, and SDSSJ142610.59+4411, which will be
rescheduled in future weeks. The replanned loads were uplinked on Aug 7.
A real-time procedure was completed on August 12 to update the on-board ephemeris. The schedule of targets for the next week is shown below |
------------------------------------------
SLJ1337.7+3800 ACIS-I Aug 15 SDSSJ110501.97+5941 ACIS-S Aug 16 PGC1202458 ACIS-S NGC1340 ACIS-S PSRJ0821-4300 ACIS-S 0FGLJ1018.2-5858 ACIS-I Aug 17 AUMicroscopii HRC-I A3695 ACIS-I Radiation Belts SN1987A HRC-I Aug 18 SN1993J ACIS-S Abell2146 ACIS-I Aug 19 NGC5582 ACIS-S PSRB0531+21 HRC-S/LETG Abell2443 ACIS-S Aug 20 Radiation Belts Abell2146 ACIS-I NGC4157 ACIS-S Aug 21 NGC953 ACIS-S Aug 22 NGC7590 ACIS-I RXJ1958.2-3011 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports