News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 5 August 2011 9.00am EDT

During the last week the observing schedule was interrupted by a high radiation event that stopped the daily load at 03:03am EDT on Aug 4 and activated the science instrument safing sequence (SCS 107). All spacecraft actions were nominal. A real-time procedure was executed on Aug 4 disable SCS-29, which was enabled during the safing sequence.

A real-time procedure was executed on Aug 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was executed on Aug 4 to update the on-board ephemeris.

Of note this week was the "2011 X-ray Astronomy School" held in Cambridge, MA Aug 1-5, followed by a CIAO Workshop on Aug 6.

Assuming the radiation environment is low enough to resume science observations later today, the schedule of targets for the next week is shown below.



------------------------------------------
 S26inNGC7793           ACIS-S       Aug  5
         Radiation Belts                     Aug  7
         XTEJ1710-281           ACIS-S/HETG
         NGC4649                ACIS-S       Aug  8
         Gl124                  ACIS-S       Aug  9
         3C445                  ACIS-S/HETG
         Radiation Belts
         SPT-CLJ2043-5035       ACIS-I       Aug 10
         CHECCS000105-2503      ACIS-I       Aug 11
         PSRJ0821-4300          ACIS-S
         NGC4649                ACIS-S       Aug 12
         Radiation Belts
         Abell1775              ACIS-S
         ESO490-IG026           ACIS-S       Aug 13
         S26inNGC7793           ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.