CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 8 February 2013 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Feb 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes an observation of GJ 436 coordinated with HST. |
------------------------------------------
RCW120 ACIS-I Feb 11 SDSS1138+0314 ACIS-S RCW86 ACIS-S Feb 12 Radiation Belts 1RXSJ141256.0+79220 ACIS-S SDSSJ1332+0347 ACIS-S Feb 13 IRASF00183-7111 ACIS-S HD79826 ACIS-S/HETG N113 ACIS-I HD79826 ACIS-S/HETG Feb 14 CODEX57507 ACIS-I RCW86 ACIS-S Radiation Belts Feb 15 SDSSJ082657.15+3606 ACIS-I SDSSJ115714.98+0816 ACIS-S G241.97+14.85 ACIS-I Feb 16 GJ436 ACIS-S HESSJ1843-033B ACIS-I PSRJ0101-6422 ACIS-I Feb 17 XTEJ1858+034 ACIS-S G359.1+0.9 ACIS-I RCW86 ACIS-S Radiation Belts 1RXSJ141256.0+79220 ACIS-S Feb 18 M31BHXN ACIS-I NGC6369 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports