News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 17 January 2014 9.00am EST

During the last week the radiation environment recovered enough following the high-radiation event of Jan 7 to resume operations. A replanned schedule for resuming science observations was uplinked on Jan 10 with 242.6ks of science loss.

The replanned schedule is shown below and includes an observation of XSS J12270-4859, which was accepted as a Director's Discretionary Time TOO on Dec 16 and had been impacted by the schedule interruption. Other impacted observations will be rescheduled in future weeks.



------------------------------------------
        XSSJ12270-4859         ACIS-S       Jan 11
        Radiation Belts
        HD193793               ACIS-I       Jan 12
        US16110890-1904468     ACIS-S
        COSMOSLegacy (2 obs)   ACIS-I
        E0102-72               HRC-I        Jan 14
        US16085673-2033460     ACIS-S
        Radiation Belts              
        Be59                   ACIS-I
        PSRJ2222+2923          ACIS-S       Jan 15
        US16020287-2236139     ACIS-S
        US16025243-2402226     ACIS-S
        DeepField09            ACIS-I
        PSRJ1607-6449          ACIS-S       Jan 16
        US16042165-2130284     ACIS-S
        COSMOSLegacy           ACIS-I
        G315.70-18.04          ACIS-I
        Radiation Belts
        PictorAJet             ACIS-S       Jan 17
        NGC6153                ACIS-S
        Wasp-38                ACIS-S       Jan 18
        PSS0926+3055           ACIS-S
        COSMOSLegacy           ACIS-I
        G229.21-17.24          ACIS-I       Jan 19
        PSRJ1627-5936          ACIS-S
        US16064385-1908056     ACIS-S
        ------------------------------------------

Since resumption Chandra has completed the observing schedule as planned.

A Chandra press release was issued on Jan 13 as a NASA press release describing observations of PSR B1509-58 and the COSMOS field by NASA's Nuclear Spectroscopic Telescope Array, or NuSTAR. Combining NuSTAR's higher-energy X-ray images with Chandra data provides a unique view of these well-studied objects. For details see: http://chandra.si.edu/press/14_releases/press_011314.html

The schedule of targets for the next week is shown below

------------------------------------------ Radiation Belts Jan 19 A2142 ACIS-S US16230783-2300596 ACIS-S Jan 21 COSMOSLegacy ACIS-I PSRJ1652-1400 ACIS-S US16094098-2217594 ACIS-S MSH11-62 ACIS-I Radiation Belts Jan 22 A2142 ACIS-S US16104202-2101319 ACIS-S Jan 23 COSMOSLegacy ACIS-I NGC6072 ACIS-S A2142 ACIS-S Jan 24 G286.58-31.25 ACIS-I Radiation Belts G085.99+26.71 ACIS-I Jan 25 G163.72+53.53 ACIS-I G036.72+14.92 ACIS-I US16154416-1921171 ACIS-S Jan 26 COSMOSLegacy ACIS-I US16035767-2031055 ACIS-S MSH11-62 ACIS-I CIHyi ACIS-S IC4637 ACIS-S Jan 27

------------------------------------------

All spacecraft subsystems continued to support nominal operations.