CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 30 May 2014 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was completed on May 27 to update the Control Processing Electronics (CPE) software to restore the nominal yaw bias following the conclusion of the 2014 Cameloparalids meteor shower. The schedule of targets for the next week is shown below and includes an observation of M83 coordinated with NuSTAR and an observation of Sgr A* coordinated with Spitzer. |
------------------------------------------
RXJ1416.4+2315Offse ACIS-I Jun 1 SDSSJ162210.11+07021 ACIS-S SDSS1004+4112 ACIS-S Jun 2 J011341.1+010608 ACIS-S SgrA* ACIS-S Jun 3 Radiation Belts 30Doradus ACIS-I IGRJ15335-5420 ACIS-I Jun 4 4C-00.62 ACIS-I 3C293.1 ACIS-S Jun 5 Centauruscluster ACIS-S Radiation Belts Jun 6 30Doradus ACIS-I M83 ACIS-I Jun 7 4C-00.62 ACIS-I 3C288.1 ACIS-S Jun 8 Q2237+0305 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports